Client: Fir Vale Academy
Location: Sheffield
Time: 2 Weeks

We spent a total of 2 weeks at Fir Vale undertaking various spray works and repair work. Because this was a new building, we started work towards the end of the project when it was just about ready to hand over. Ranging from the inside to the playground canopy’s, there was a significant amount of damage throughout the building. And with a 2-week deadline to meet we had a lot of work to do.

As you can see from the pictures on our slideshow, there was a gap at the top of the canopy which needed to be filled level and re-sprayed. The end verdict stunned our client and saved a lot of hassle, time and money in the process. We repaired scratches and dents on window frames and curtain walling throughout the building on top of work mentioned above.